Installed and Removed by Metro
Metro’s Elevator Constructors can eliminate the need of pouring a concrete pad to support the weight of our hoists. As you can see, the steel base pad needs only a 12’ x 16’ level and compacted area. When the job is completed, the pad is removed and there is no concrete removal or disposal necessary.
![Steel Base Pad steel base pad](https://i0.wp.com/metroelevator.com/wp-content/uploads/2013/02/steel-base-pad-manlifts.jpg?resize=484%2C363&ssl=1)
16′ x 12′ steel base pad
![Steel Base Pad 2 describe the image](https://i0.wp.com/metroelevator.com/wp-content/uploads/2013/02/steel-base-pad.jpg?resize=487%2C368&ssl=1)
Steel base pad with hoist installation