Installed and Removed by Metro
Metro’s Elevator Constructors can eliminate the need of pouring a concrete pad to support the weight of our hoists. As you can see, the steel base pad needs only a 12’ x 16’ level and compacted area. When the job is completed, the pad is removed and there is no concrete removal or disposal necessary.